Zimmerman 6/29/17

Heavy rain and thunderstorms blew through the valley every day so far this week. The masons were able to finish up the rock work at the front entry, except for the stones around the front door, which will go in after the door is set. The sheetrockers are almost finished hanging the first floor, with just the great room ceiling remaining. The master wing has been taped and mudded and is waiting final texture. The county signed off on framing and rough-in in the habitable basement on Wednesday, and the insulators sprayed the basement walls today. The plumber was on site finishing up rough-in for the entry powder, master bathroom, and several tie-ins in the mechanical room. The tile guys moved over to the master shower to prep and start tiling that room. The carpenters are working on window and door trim in the guest bedrooms. The excavator returned to prep the exercise room and ARU terraces, and hopefully dig the gas lines tomorrow so he can continue the sandset terrace prep. The garage door arrived for the ARU and was installed today. ARU light fixtures and cabinet hardware have shown up, and flooring is expected next week.

 

RETURN TO ZIMMERMAN RESIDENCE HOME PAGE

Custom Wordpress Web Design