Bob & Stacey –

The framing crew is continuing with the exterior window and door installation, fascia and soffit, and punch list interior framing (blocking and altering framing for the plumber and HVAC crews).  The mason is starting on the exterior stone veneer, so the framing crew is also installing flashing ahead of the masons.  The roof over the Family Room terrace is almost complete, with the fascia going on, and then it’s ready for the finished roofing.  We will have the mason do the stone on the chimney before the roofing goes on.  Weather was great this week, dry, and getting into the upper 60’s.  – – Dave