Bob & Stacey –

The front walk and entry stone work is complete.  The roofers finished installing the standing seam metal roofing, just in time for the snow to pick up.  The carpenters are continuing with the interior doors, window sills, and faux trim (sounds better than work boards!) on the main floor.  Also working on the wood ceiling in the Entry, ahead of installing the timbers.  Upstairs, the drywall crew is continuing installing the L-metal edging and corner bead, and we are almost done with the custom routing for the hydronic heat tubing.  The tubing has been installed on the two easternmost bedrooms.  We just got set-up with a large temporary propane tank and heater today, for heating the hot tub area concrete.  Should be pouring the walls early next week.  The painter will be picking up the uptstairs doors tomorrow, to take them to his shop for finishing.  Sorry only a few pictures today, my camera died after 4 shots.  Will send more on Monday!  – – – Dave