Bob & Stacey –

The masons are finishing up the stone veneer on the front of the house, and will be starting inside next week.  The snow and rain we had for most of the week slowed down the front walk and entry work, so hope to get that poured next week.  The carpenters are hanging doors, installing the faux trim, and starting the timbers in the Master Bedroom.  The electricians have installed the electrical service equipment in the exterior closet at the Garage, and we trenched for the power line from the transformer.  We should be switched over to the electrical service early next week.  The excavator will be finishing up the leach field after the power is done, and then will start the hot tub/east terrace prep.  The painter will be picking up the 2nd floor doors to take to his shop for finishing later next week.  Looks like a nice weekend, so hopefully the weather holds for next week.   – – – Dave