Marozzi-10-11-18

John & Marlene –

Cool and a bit wet this week, but supposed to be nice for your visit next week.  We are still waiting on the paving, supposed to happen on Monday.  The wood flooring is scheduled to arrive on Tuesday, and will go in the garage until the mason is done with the fireplace stone.  Paul is continuing with the interior trim, working in the Jr. Master today.  The tile crew is working in the shower bath upstairs, and the Entry and Powder Room downstairs. The painters are concentrating on the Living Room/Kitchen/Dining areas, getting those areas done ahead of the mason and the wood flooring.  The electrical will be hooked up to the well tomorrow, and we should have water sometime next week.  The mason is prepping the fireplace for stone veneer, and will start on that as soon as the painter is done with the ceiling.  The gas boiler is installed, and the hydronic tubing has been charged with the glycol mixture.  We just need some electrical hooked up, and the gas meter installed, and we can start the floor heat.  Hope to have that ready by the end of next week.  – – Dave

Custom Wordpress Web Design