Except for a brief shower Tuesday morning, this was another week of hot dry weather – the framers are blowing through exterior wall framing at a great pace. Another load of material arrived Monday morning, and, except for the front entry wall and the garage, Ken’s crew has all exterior walls framed and sheeted. We expect to see the excavator back on site either over the weekend or first thing Monday morning, and Lower Valley will set the conduit, new transformer, and temp power panel Tuesday morning. We could potentially see the well rig next week, but it’s not critical at this point, so we’ll just be patient!