Marozzi-7-12-18

John & Marlene –

The insulation is done, and the drywall is being installed.  The electrician flipped the electrical panels into the hallway, and the plumber has been finishing up the last of his rough-in.  The tub should be here next week, and he will get that set.  The fireplace chase is mostly framed, and the fireplace should also be installed next week.  I’m working on getting the interior trim, interior doors, and wood ceiling materials ordered.  – – – Dave