Great progress on framing this week, with the exterior walls standing and sheeted. The crew is working today on interior walls, and will wrap them up Monday. The excavator dug the power and propane trenches, and Lower Valley, Charter, and Amerigas all installed their respective conduit/line in the trenches. We are finally off the generator and on real power! The excavator also dug trenches for the deck piers, and the concrete guy is working on building the footing forms off-site. He will mobilize Monday after the surveyor stakes out the pier locations.

 