Very cold this week with temperatures below zero, but we’re working inside! The drywall crew made good progress on hanging the ceilings and some of the walls. They will continue through next week. When they’re wrapped up, we should start to see some of the tile and flooring go in. The HVAC crew is still on site, working in the crawlspace on their ducting and furnace connections. They were able to get the linear air return in the ceiling over the living room fireplace. We passed the fire blocking/draft stop inspection, so can proceed now with covering all the walls and moving forward with finishes.