Harris 8/4/16

This week was about wrapping up loose ends. The interior hand grip was installed on the stair railing, and the exterior railing was installed. We are waiting on the last two corner pieces to arrive from the powder coater’s, and then the final cap can be installed. The building inspector was onsite on Monday morning to do his preliminary final inspection and give us a punch list. It was a short list, and we’ve been taking care of those items for the past several days. He returned Wednesday afternoon to check up on everything, and we are awaiting gas line bonding for the complete certificate of occupancy. Chris, Ben, and I did a walk-through on Monday as well, adding a few additional items to the overall punch list. We anticipate the kitchen flooring install will start next week, as the subfloor is drying out really well with two fans and the warm dry weather.