Morse-8-4-16

Bob & Stacey –

The insulator started on the spray foam insulation on the upper floor this week, starting at the Master Bedroom and moving east.  The Master Suite is complete, and they are rolling through the rest of the upstairs.  The roofers dried-in the roof last week, and the carpenters are continuing with the exterior siding and trim.  They are also working on the timbers in the Library, and will then move to the Guest Master Suite.  The subs. are working on rough-in on the main level and basement.  The new timber columns arrived today for the front entry porch, so that work will resume on Monday.  The excavator is prepping the terrace areas for concrete, and we should be pouring most of the terraces around the 16th-17th.  We should be seeing the latest cabinet shop drawings early next week.  The masons are just about done with the climbing wall, and are working on the rest of the stone veneer around the exterior of the stair well.    – – – Dave