Ann –

The masons have finished the stone veneer on the retaining wall, and just have the cap to install. There will be a small area of stone above the basement window that will be installed after the deck ledger and flashing are installed.  They will be moving into the basement to install the fireplace stone veneer early next week, after the mantle is installed.  They will also be receiving the entry porch flagstone early next week, and will be starting on that area soon.  The drywall hangers are working on the main level.  The insulators were onsite this morning, and installed the rock wool between Henry’s suite and the Master Closet, above the wall, as you requested.  The painters will be done tomorrow in the basement with the first coat of color on the walls, and the ceilings will be finished.  The forced air crew is finishing up the last of the ductwork, including moving a duct in the Kitchen, ahead of the drywall crew.  The clear vertical grain Douglas Fir window material arrived this week, and the stain to match the windows is on order.  The exterior man door for the Garage arrived today. – – – Dave

Custom Wordpress Web Design