Bob & Stacey –

We’re having a mid-winter thaw, not too warm, but upper 30’s for highs makes the framing go easier!  The crew has framed in the south window wall at the stairwell, and the floor at Bedroom #3 was also framed this week.  The roof overbuild areas are being framed, ahead of sheathing the roof.  Exterior walls are being sheathed, and the Family Room area and Bedroom #3 are next.  The crew is also starting the framing at the Living Room window wall.  The fascia material will be shipped to us from Bozeman next week.  – – – Dave