Bob & Stacey –

The framing crew is working on second floor walls and steel columns, setting lower roof trusses, and second floor deck framing.  They have set some of the 8×12 reclaimed timber “lookouts” that will carry the double 4 x 10 rafters at the exterior.  They will be working on Friday this week.  The excavator finished up the backfill of the north retaining walls today, and will finish up the backfill across the front of the house next week, before shutting down for the winter.  The revised elevations are at the printer, and I will pick them up on Monday and start to get cabinet, tile, and countertop bids. Have a great Thanksgiving!  – – – Dave