Marozzi-9-20-18

John & Marlene –

The painters are working on the windows, and prepping the timbers for stain.  The tile sub. is finishing the prep. for tile, and will start installing in the upstairs bathrooms tomorrow.  Weber Drilling will be onsite Monday to run the water line from the well to the house, and Powers Excavation will be digging the trench tomorrow.  The gas line was run while I was on vacation.  The interior doors are being installed, and the interior trim should start next week.  The garage doors will be installed next week, along with the front door.  Then we will be enclosed – just in time for the weather to cool off!  We’ve had a beautiful September, so far, with temps. in the 70’s during the day.  Will be more fall-like next week.  – – – Dave