Kurt –

We passed the insulation inspection this morning, and the crew is now installing the ceiling/soffit material.  We are using what we can of the material that was removed, and the new material will arrive in 2 weeks.  I’ve attached a few pictures of a potential solution to the ext. trim on the windows, to match the existing.  Let me know what you think.  We can meet onsite next week if you want to look at this in person.  This would cover the pine brick mold trim that is on the windows.  The edge of the pine sill would be exposed, with a cedar bottom casing piece butted up to the sill.  – – – Dave