The weather has been alternated between sunny, cold, cloudy and mild, which means spring is hopefully almost here! The siding crew has enjoyed the longer days and have completed the south and master wings, as well as the front entry. They have another week to go and then should start in on the decking. The deck material arrived this week, as well as the exterior drywall material for the porch soffits. The drywall crew has finished hanging sheetrock in most of the house, and are starting to install the shadowline trim and other details. We should be able to see some texture samples on Monday so they can move right in to that phase.