Kurt –
The log work started today, and they are dry fitting the log columns in front of the Manager’s Residence cabin, getting them located before working on the attachments. The blocking and plywood is mostly complete at the deck, and the insulator will be out on Monday to look the job over, and see where they can fit us in their schedule. They are booked until mid-January, but he thinks he can squeeze us in sooner, as it’s a small job, and a good filler. Will keep our fingers crossed! They have started to peel back the shingles on the Office Cabin roof, in preparation for the framing and log work in that area. Looks like the tent will get a test tonight, and over the weekend, with snow in the forecast. I will be doing snow control to keep things from collapsing! – – – Dave