Dwan-4-25-19

Ann –

The framing crew is working on the north wall of the Living Room and Den/Game Room, reframing for the new windows. They are also continuing with leveling the floor, and filling in the areas that were dropped for the previous floor finishes. They have started removing the steel/wood beam above the pool table area, and getting ready for the fabricator to come over next week and set the last steel beam in the floor. The excavator and engineer are scheduled for Monday, weather permitting, to backfill around the Master wing, and start the excavation for the deck retaining wall, and the foundation work at the connector. Awaiting Jason’s drawings and specs. for the Master Bedroom wall move. – – – Dave